← The Journal
OperationsMar 21, 20266 min read
Inside the Make Ready Board: How Ravera Cuts Unit Turn Time by 38%
A look at the make ready board powering Ravera’s turn workflow, from move out inspection photos to rent ready handoff, in 9.2 days average.

This article is part of the Ravera Journal. The full piece is coming soon — for early access, subscribe via hello@ravera.co.
In the meantime, the case study on the real ROI of AI voice in multifamily leasing covers the operating-metrics work behind this area.
